M i n e
R e p o r t in accordance
with S.A. IIg 135 |
||||||||||||||||||||||||||
= = = = = = = = = = = = = = = = = =
= = = = = = = = = = |
||||||||||||||||||||||||||
1) Time of mine deployment,
Wind and Sea State at deployment. |
||||||||||||||||||||||||||
31.7.43 06.46 - 07.27 hours, wind calm and sea state 1. | ||||||||||||||||||||||||||
2) Exact navigational date about position of the minefield or fouling or position of the individual parts by length, width and bearing. | ||||||||||||||||||||||||||
|
||||||||||||||||||||||||||
3) Position, width and passage course of a mined opening; any description and their position; usable objects on land to find and pass through the mined opening. | ||||||||||||||||||||||||||
Lighthouse Cape Charles, Light buoy - Smith Island Shoal. | ||||||||||||||||||||||||||
4) If all used auxiliary buoys were removed during mine deployment; if not which remained in place and where. | ||||||||||||||||||||||||||
No auxiliary buoys used. | ||||||||||||||||||||||||||
5) Number of the deployed mine devices and how they are distributed by number and type in the individual sections of the minefield. | ||||||||||||||||||||||||||
1 Group, 8 T.M.C. | ||||||||||||||||||||||||||
6) Spacing of the mine devices, mistakes in the spacing, any breaks in the minefield. | ||||||||||||||||||||||||||
Distance 1000 meters, no error in distance. | ||||||||||||||||||||||||||
Click the flag to view the above page from the original German KTB |
7.) Probable depth level of the mines | ||
a) Mine at low tide | ||
b) Mine at high tide | ||
Failures, incorrect operation of the mines, surface residue and other irregularities. | ||
a) 18 meters Failures not observed | ||
b) 23 meters | ||
8.) Degree of the reliability of detailed data. | ||
Accurate to 1/2 mile. | ||
9.) Was the mine deployment observed by the enemy and any indication that the enemy has become aware of the operation? | ||
No. | ||
10.) In what way and when was the first mine Mine Report submitted? | ||
Radio Message to B.d.U. | ||
11.) Are chart sketches and certification attached? | ||
Yes. | ||
signed in draft W e r n e r | ||
Lt.z.S and Mine Officer. | ||
signed in draft S i e g m a n n | ||
Kaptlt. and Kommandant | ||
Certification A |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
=========== |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Concerning mine and mine devices
deployed |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
in enemy waters and off the enemy
coast. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
signed in draft K r e f f t e r signed in draft W e r n e r | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Flottillenobermechaniker (Mines) Lt.z.S and Mine Officer. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
signed in draft S i e g m a n n | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Kaptlt. and Kommandant | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||